Views: 0 Author: Site Editor Publish Time: 2025-04-09 Origin: Site
![]() | ![]() |
With the ongoing "dual-carbon" goals, the electrification of heavy-duty trucks is becoming a new focal point in the new energy transportation sector. Compared to passenger vehicles, electric heavy-duty trucks have higher requirements for charging efficiency and energy management platforms in real-world operations. EVTAURUS recently implemented a heavy-duty truck charging station construction project in Inner Mongolia, featuring 320kW ultra-fast DC charging and a customized OCPP platform system, providing strong support for logistics companies’ efficient transformation.
A logistics company in Inner Mongolia operates several new energy heavy-duty trucks with a battery capacity of 800 kWh. The company faces three major challenges in daily operations:
Long waiting times at public charging stations, limited resources, and disorganized scheduling
Ordinary fast-charging stations take too long to charge, affecting operational efficiency
Lack of a unified platform, fragmented driver operations, and lack of data tracking
The company urgently needed a high-power charging solution with an accompanying operational management platform to achieve unified charging scheduling and energy consumption management.
To meet the customer’s "fast charging + platform" needs, EVTAURUS provided the following customized solution:
Achieves 4.5 kWh of charge in 1 minute
For heavy-duty trucks with an 800kWh battery, charging takes approximately 2.5 hours
Designed for year-round operation, adaptable to cold climates, with an IP55+ protection rating
Drivers can start charging by scanning QR codes, supporting WeChat/Alipay/IC cards and other payment methods
Real-time power data upload, with charging records available for export
Supports remote control, scheduled pricing, and revenue management
Extendable API for integration with scheduling systems, ERP systems, etc.
Technical staff conducted on-site assessments in Inner Mongolia
Wiring and station installation completed according to high-power heavy-duty truck charging station design standards
Full "turnkey" delivery, from products to platforms
After the installation of EVTAURUS’s 320kW fast charging platform, the logistics station’s charging efficiency improved significantly:
Metric | Before Optimization | After Optimization | Improvement |
---|---|---|---|
Average Charging Time | > 4 hours | ~2.5 hours | Reduced by over 40% |
Daily Charging Frequency | 1 time/day | 2-3 times/day | Increased by at least 1x |
Vehicles Available for Scheduling | ~60%-70% | >90% | Significant increase in vehicle utilization |
Data Accuracy for Platform Statistics | No unified access, data untracked | Real-time upload, complete record | Full digitalized operation |
Customer Feedback:
“Drivers used to spend the whole morning going back and forth to the charging station. Now we’re done in just 2.5 hours, making scheduling more flexible and boosting operational efficiency.”
In the field of electric heavy-duty trucks, both battery swap and fast charging models are developing in parallel:
Battery Swap Advantages: Quick and ideal for high-frequency short-distance operations
Battery Swap Challenges: High costs, difficulty in standardization, and high operational barriers
However, the 320kW ultra-fast charging system provided by EVTAURUS perfectly meets the needs of "exclusive fast charging" for medium to large fleets, becoming the preferred solution for many companies.
According to the China Association of Automobile Manufacturers (CAAM), in 2022, sales of electric heavy-duty trucks in China reached 25,100 units, with battery swap models accounting for 49.4%. With ongoing breakthroughs in charging technology, the combination of fast charging + platform management will have a promising future in the market.
This project is not just a successful charging station installation; it also demonstrates EVTAURUS’s ability to provide comprehensive solutions in the electrification of heavy-duty trucks.
We firmly believe:
“What our customers need is not just a charging station but a complete system to enhance operational efficiency.”
Contact EVTAURUS, and we can provide:
320~480kW high-power DC fast charging stations
Battery swap station planning and system integration
Customized commercial OCPP platform development
One-stop delivery, fast deployment
Copyright © 2023 Nanjing Jiutai Information Technology Co., Ltd. All rights reserved. | Sitemap | Privacy Policy | Supported by leadong.com